Thursday, November 19, 2009

Structural Mark-up

This is a mark-up from the structural engineer, Joe Fullone. I have some work to do to incorporate some of the requirements of Joe's analysis. The 8'-0" doors have a large tributary area that is transferring into the jambs. I will need to increase stud spacing from 16" OC to 8" OC in areas.
I continue to work on the construction drawings...

No comments:

Post a Comment